Holiday Office Closure

In observance of the Christmas holidays, Railroad Commission of Texas offices will be closed December 23-27. The offices will re-open at 8 a.m. on Monday, December 30 for regular business. Expedited Drilling Permits will be processed within standard processing times. If assistance is needed, please email Drillingpermits-info@rrc.texas.gov.
RRC maintains a 24-hour emergency phone line to report any leaks or spills. That number is 844-773-0305

USA Flag

This website will be undergoing maintenance today, please be patient as some pages may be slower to load.

Surface Coal Mining & Exploration

One of the state's most abundant energy resources is a form of soft coal called lignite. Many lignite deposits lie close to the surface, easily reached with modern mining technology. In 1975, the Texas Legislature gave the Railroad Commission jurisdiction to regulate surface mining for coal and uranium. Companies mining coal/lignite in Texas must have a Commission permit and post a bond for each site they operate in the state. The goal of the coal mining regulations is that the mined land is returned to a condition that is as good as, or better than, it was before mining. Division field personnel make, at a minimum, monthly visits to mine sites, checking for compliance with coal mining regulations.



Commissioners